I appreciate more, Of course the allowable tolerance for water surface calculation is minimum 0.1mm which is acceptable to my profile computation with 1.2m wide and 0.28m dip flume flow, we can take as small (field) irrigation canal. and I read one literature that compares the flume flow with in different 1D modelling softwares and the author mensioned HECRAS did well with Energy method, but there is no full information about his procedur. That is why it made me in doubt. any way you helped me a lot, thank you so much.
If you do not mind can i ask another? I saw that the bridge/culvert can skew up to 45 degree only, is that possible to use more than 45 degree mannualy using "cosine value" in excel, and paste it? the mechanism is shown in manual,and it is clear. why HECRAS limit to 45? (I need to check up to 70 degree)