StructureMan44
Structural
- Dec 10, 2014
- 201
A 10 acre project needs the ground lifted 15ft. The existing site is swampy and directly adjacent to a lagoon. How do I know if (and how deep) the existing swampy soil needs to be cut and filled in order to have a stable surface to add the 15ft? The 10 acre site will hold a small power plant. This is for a very preliminary estimate. From my name you can tell I'm structural and this is way outside my wheelhouse.