I am a contractor looking for some help with regard to two way slab estimating. In particular verifying lengths of added steel for both column and middle strip areas. No one that I have been talking with has been able to give me a straight answer and when I compare an old shop drawing to calculated lengths based on the chart from ACI Code 13.4.8 I do not get the same number that the detailer used. Thanks in advance.