Jan 28, 2007 #1 WhoDey09 Mechanical Joined Jan 28, 2007 Messages 3 Location US How is capacity control in a direct fired absorbtion system accomplished? Who Dey
Jan 28, 2007 1 #2 absrbrtek Mechanical Joined Nov 9, 2003 Messages 57 Location US Its done two ways, the first and most commonly used method is controlling the heat imput up or down to the high temp generator. Second way is combined with the first but they use a VFD absorber solution pump. Upvote 0 Downvote
Its done two ways, the first and most commonly used method is controlling the heat imput up or down to the high temp generator. Second way is combined with the first but they use a VFD absorber solution pump.