ABU312
Structural
- Jul 9, 2003
- 4
We are designing tank (Dia 20m -30m) foundations for a Petroleum product storage facility. the soil investigation revealed that the sub-grade is made of Pit(Organic matter) to a depth of 19-23m below existing ground level. we initially proposed two options thus: Piling or soil improvement by Vibro-flotation technique.
The client refused the two option base on cost consideration and suggested soil replacement to about 4m. our geotechnical expert advised that the pressure bulb analysis shows that the pressure at the bottom of replaced soil is still more than the bearing pressure of the pit.
The client insist that it has work for them elsewhere. However, they are willing to carryout gradual loading while observing for failure. and are also willing to manage the significant settlement expected. This we believe is not right.
I will appreciate any ideas.
Thanks.
Abu
The client refused the two option base on cost consideration and suggested soil replacement to about 4m. our geotechnical expert advised that the pressure bulb analysis shows that the pressure at the bottom of replaced soil is still more than the bearing pressure of the pit.
The client insist that it has work for them elsewhere. However, they are willing to carryout gradual loading while observing for failure. and are also willing to manage the significant settlement expected. This we believe is not right.
I will appreciate any ideas.
Thanks.
Abu