If I design a pressure bound bolted joint with metal to metal contact and an o-ring sealing method, what bolt preload can be used per ASME B31.3 / VIII Div. 1 Code?
This joint would fall outside the configuration types of Appendix Y (Flanges with metal to metal contact). Appendix Y tells you to compare the calculated bolt stress to the allowable bolt stress. Appendix S seems to say that you can expect to exceed the allowable bolt stress during actual tightening.
I want to design this joint in a simplified way, and compare hydrostatic forces to bolt preload, and neglect contact forces calculated in Appendix Y. I want to utilize as much bolting strength as possible. The allowable bolting stresses are very conservative, and given what is stated in Appendix S, don't seem to be hard rules. Can you base a bolt preload on 75% yield and be OK with regards to ASME code?
This joint would fall outside the configuration types of Appendix Y (Flanges with metal to metal contact). Appendix Y tells you to compare the calculated bolt stress to the allowable bolt stress. Appendix S seems to say that you can expect to exceed the allowable bolt stress during actual tightening.
I want to design this joint in a simplified way, and compare hydrostatic forces to bolt preload, and neglect contact forces calculated in Appendix Y. I want to utilize as much bolting strength as possible. The allowable bolting stresses are very conservative, and given what is stated in Appendix S, don't seem to be hard rules. Can you base a bolt preload on 75% yield and be OK with regards to ASME code?