charlierock...the estimates provided are good for Type I portland cement. With all the blends and mix contortions the ready mix suppliers use to save a few bucks, these correlations can sometimes be off a bit.
If your mix has any proportion of ground blast furnace slag cement in it (NEWCEM or similar), then you can expect the 7-day strength gain to be significantly lower than predicted or expected by correlations for plain Type I. The 28-day strengths will not be significantly affected, but the strength gain is slower than with plain Type I cement.
Fly ash causes a similar slowing of the strength gain, though less pronounced because it is usually used in smaller proportions.
Ask the ready-mix supplier for a strength gain curve for their mixes. This should get you where you want to be in your predictability.