astroid
Electrical
- Aug 24, 2002
- 20
A turbo generator rated for 60 hz is required to generate at 50 hz. Assuming all utility eqipment are changed to 50 hz, and monitoring, metering and protection settings are availible for 50 hz, will changing governer setting to slower rpm and adjusting excitation be able to deliver rated power at 50 hz.