deedo1124
Electrical
- Dec 27, 2007
- 17
Replacing some PCB containing surge capacitors in a 4160V compressor motor termination box. Contractor reccomends replacing the short length of cable also. Here's our dilema the existing cables are non sheilded. If we replace this short length with sheilded cable as required by the current code what should we do with the sheilds? The existing motor feeds from the gear are un sheilded and are not being replaced. Picture is attached for reference