We have always specified 60 ksi bar over 40 and have never ran into any cost issues with it. Several contractors (who normally complain about every cost we put into the job) have also never taken issue with this specification.
I don't know the exact cost figures or cost indexes, but I do not think the cost is significant anymore to worry about.
PE, SE
Eastern United States
"If a builder builds a house for someone, and does not construct it properly, and the house which he built falls in and kills its owner, then that builder shall be put to death!"
~Code of Hammurabi