If I am using 4-leg wire rope slings to lift a load whose CG is offset from the pick point, would my load remain perfectly horizontal or would it tilt?
Thnks.
 
Replies continue below

Recommended for you

ok, the load is at the CG of the piece ... what's stopping you from moving the lift point so it is directly above the load CG ?
 