Hi there,
This culvert has an overburden of 2m and therefore the wheel loading from ONT truck has to be spread by using a pyramid which base is B=b+1.75H on each direction.
Now, S6-14, 6.12.6 states the following: "When distributed wheel loads from two or more wheels overlap, the total load of those wheels shall be uniformly distributed over the smallest rectangle that includes their individual areas...". A colleague and me have been debating as how to interpret this part, I included an image that is self explanatory, so the question is: is it w in X, or w1 in Y?
Thanks a lot
M.
This culvert has an overburden of 2m and therefore the wheel loading from ONT truck has to be spread by using a pyramid which base is B=b+1.75H on each direction.
Now, S6-14, 6.12.6 states the following: "When distributed wheel loads from two or more wheels overlap, the total load of those wheels shall be uniformly distributed over the smallest rectangle that includes their individual areas...". A colleague and me have been debating as how to interpret this part, I included an image that is self explanatory, so the question is: is it w in X, or w1 in Y?
Thanks a lot
M.