Rizgar
Electrical
- Aug 25, 2003
- 16
Hello,
we have two medium voltage (3.3Kv)cables of size (3/C-185sq mm + 3/C-70 sq mm) feeding same load from a generator that we want to Hipot test them. Is it right to short the three cores (phases A, B and C) and connect it to ground in both ends of first cable and the 3 cores (phases A, B and C) of the sceond cable (that we want to test) are short and connected to the supply terminal of Hipot test equepment, the other end (phase A, B and C) of the same cable are shorted. The return path and ground terminal of the test equipment are connected to the ground.
Knowing that the sheath of cables are grounded and the 7.6Kv DC supplied . Is this right or there is another wayes to connect the the cable phases to the hipot device.
Thanks,
we have two medium voltage (3.3Kv)cables of size (3/C-185sq mm + 3/C-70 sq mm) feeding same load from a generator that we want to Hipot test them. Is it right to short the three cores (phases A, B and C) and connect it to ground in both ends of first cable and the 3 cores (phases A, B and C) of the sceond cable (that we want to test) are short and connected to the supply terminal of Hipot test equepment, the other end (phase A, B and C) of the same cable are shorted. The return path and ground terminal of the test equipment are connected to the ground.
Knowing that the sheath of cables are grounded and the 7.6Kv DC supplied . Is this right or there is another wayes to connect the the cable phases to the hipot device.
Thanks,