A customer needs to start using some pumps that have been offline for several years, typical unit is 900hp 2400V with 200kVar power factor correction capacitors connected on load side of contactor. We'll test the motor windings from the panel with our Baker ADX12 (Resistance, IR/PI, Surge, etc. - DC Hipot at reduced level, only if desired by customer).
How to test the old Westinghouse capacitors prior to energizing though? Might they need reforming? Do we need to figure out how to energize them separate from the motors?
How to test the old Westinghouse capacitors prior to energizing though? Might they need reforming? Do we need to figure out how to energize them separate from the motors?