fazel1, IMO it depends on the wall thickness, material, inspection criteria, PWHT requirements, and most of all the level of welding talent available. At the beginning of a job I'll RT after 3/8", final, and post-PWHT. If the talent is there based on weld quality of first few RT's, I'll only RT final and post-PWHT. My experience is that MT/PT doesn't do much for finding root concavity or LP problems. MT can be performed relatively "hot" though, so can RT if film is protected by insulation barrier. That said, always take the last RT at ambient temp. As Rob said, "Weigh it up against the benefit."