advsign
Chemical
- Dec 22, 2006
- 14
I have 2 vessels that I want to tie together to go into a flame arrestor. During operation one vessel is at high pressure and the other one is at a low pressure.
Say if the current PSV outlet is 4", can I run 4" pipe to tie them both into a 4" flame arrestor or do I need to upsize the line.
If so which line would need to be upsized? The common line before the flame aresstor?
Thanks,
Say if the current PSV outlet is 4", can I run 4" pipe to tie them both into a 4" flame arrestor or do I need to upsize the line.
If so which line would need to be upsized? The common line before the flame aresstor?
Thanks,