1998 sect I pg-58.3.2- date of revision or interpretation

Status
Not open for further replies.

davefitz

Mechanical
Joined
Jan 27, 2003
Messages
2,927
Location
US
Can anyone advise the code case or interpretation that led to the revision of sect I pg-58.3.2? In particular, I need to obtain the date of effect of the wording change - prior to about 1998, that paragraph required boilers installed on a header system to use one "non-return valve" plus one stop valve on the steam connection to the header. After about 1998, the wording chagned to require 2 stop valves plus a bleed.
 