Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations TugboatEng on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

15 kV clearance issue

Status
Not open for further replies.

tommom

Electrical
Joined
Mar 1, 2005
Messages
81
Location
US
I have a contractor who has located a junction box within 4'6" of the front of my switchgear - contrary to the drawings. According to NEC 110.34 (A), condition 2 for 7200 volts to ground, we need 5'0".

What I would like to do is cover or coat the box with insulation to make it Condition 1 for that table, requiring only 4' clearance.

Any ideas? We've considered replacing the box with something 6" shallower, replacing it with a fiberglass box, moving the switchgear, moving the box. None of these can be done.

 
The box can be moved. The contractor may not have enough money to make it happen, but the box can be moved.
 
Can you raise it up so it is well above the top of the gear? If it is just a TJB, there is normally little need to access it after it is installed.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top