are these amounts 0.18 percent enough? Even if playing with construction sequencing, pour every other 15 m first then leave it shrink, and then pour the rest in few weeks, the shrinkage is still considerable and I am worried about the cracking... On the other way, as there is a creek running through trying to avoid movement joints. Thanks.