FYI- I've seen a number of installations where they had, say, 12" pipe, reduced it to 8" to run through a meter (or control valve), then back up to 12"- for the purpose of saving money.
That 4 PSI loss sounds like a lot to me. Is that based on an orifice plate, maybe?