Cuyanausul
Mechanical
- Aug 27, 2005
- 67
Does any one have experience with a change in NDT for pipe welding in a contract by changing the % x rays from initial 15% to 100% aasked by the client.
In our case due to the diameter of 48" and 36" the hidrostatic tests were not practical and the client decided this change. But... for us, the contractors, I feel this will increase our probability of finding more refused welds, and of course bring more costs?
Would you charge more if you were to do 100% instead of initial 15%, (ASME B31.1). Not by the price of Xrays but because of the probability of more refusals?
In our case due to the diameter of 48" and 36" the hidrostatic tests were not practical and the client decided this change. But... for us, the contractors, I feel this will increase our probability of finding more refused welds, and of course bring more costs?
Would you charge more if you were to do 100% instead of initial 15%, (ASME B31.1). Not by the price of Xrays but because of the probability of more refusals?