RogerJZ
Electrical
- Nov 23, 2008
- 3
Hi,
I would like to do a conceptual design for a plant that would be used to charge batteries used in electric vehicles.
I estimate that they would take 24 hrs for a full charge. So that batteries are removed and replaced with a fully charged battery, rather than charged in the vehicles.
I estimate it would need 1 MVA continuous service to this plant.
I am new to the Power Engineering, but have 22 years in Electronic Hardware and Software design. I have experience in developing SCADA and ICAC equipment for substations.
Could someone assist me on the steps to take to come up with a conceptual design for a 1MVA plant in North America. Assume this is in a city so has access to typcial voltages there, I think 12.2kV feeders would be common.
I am not sure if this would be considered a Service Drop or a Substation, and where the line is drawn between the two.
Any suggestion would be appreciated
Thanks
Roger
I would like to do a conceptual design for a plant that would be used to charge batteries used in electric vehicles.
I estimate that they would take 24 hrs for a full charge. So that batteries are removed and replaced with a fully charged battery, rather than charged in the vehicles.
I estimate it would need 1 MVA continuous service to this plant.
I am new to the Power Engineering, but have 22 years in Electronic Hardware and Software design. I have experience in developing SCADA and ICAC equipment for substations.
Could someone assist me on the steps to take to come up with a conceptual design for a 1MVA plant in North America. Assume this is in a city so has access to typcial voltages there, I think 12.2kV feeders would be common.
I am not sure if this would be considered a Service Drop or a Substation, and where the line is drawn between the two.
Any suggestion would be appreciated
Thanks
Roger