Good Morning at all
I have a question regarding to a design verification.
I have a connection that is composed by four M20 bolts, located at the extremity of an ideal square. As per Eurocode 3 this connection could be classified as Shear Connection - Category A Bearing Type.
Moreover because...
Hi everybody
I know my question could be very stupid, but:
1) there is a way in patran to create a new group with all the free elements and free nodes of the model?
It means a node that it is not joint with any elements.
Because I have to clean a *.bdf file and write down every anomaly, and...
Thks for the prompt replay, but I can't do that.
More specifically it will be expensive, becuase I have to do some analyses and every one cost at least 90Hours.
For technical reasons I can't do a restart from the previous one so I have to find a different way.
Hi everybody
I have a little problem.
Is it possible to write different output in different .op2 files?
Let me do an example:
I have 100 elements (ID from 1 to 100), and I request the stress.
Is it possibile to have the stress for the elements in the range 1-50 into the file filename1.op2, and...
And now i'm here again.
I believed to find a solution for Force on CBUSH elements, but now i'm still confusing.
Can someone please explain me the values reported on the F06?
( FORCE-X FORCE-Y FORCE-Z MOMENT-X MOMENT-Y MOMENT-Z )
How to consider the value, positive and negative.
I understand...
Hi all
I don't understand the ELFORCE card on the CASE CONTROL COMMAND.
If I build 4 nodes, 2 rbe2 and a cbush
GRID,1,,0.,0.,0.
GRID,2,,1.,0.,0.
GRID,3,,1.,0.,0.
GRID,4,,2.,0.,0.
RBE2,10,1,123456,2
RBE2,11,4,123456,3
CBUSH,100,100,2,3,,,,0...