Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations cowski on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  1. rommar

    HDPE PIPELINE INSPECTION

    Hi all, I am new in the mining and I would appreciate any guidance how to perform an integrity inspection on existing HDPE- DR 7 and DR 9 slurry tailing pipelines > 20 inch. Many thanks, RM
  2. rommar

    Calculation of Load on Centre Idler Roll

    Hi all, Also moving from O&G to mining. I would appreciate any guidance how to perform an integrity audit on HDPE- DR 7 and DR 9 slurry tailing pipeline > 20 inch. Many thanks, RM
  3. rommar

    Recommenden PM for Engineering and construction books

    Hi I just entering the PM field in engineering and construction and would be advised recommended books for self study in project management. thanks, RM
  4. rommar

    design 40 ton gantry lifting frame

    All I want to design a safe max 40 ton A frame lifting device to lift materials, equipment from a mobile truck. Anyone can help/guide me where to start. Appreciate yor support. RM
  5. rommar

    pigging operation

    Anyone has pigging work method of statement (manual) how to run a brush pig trough a 10 inch an 8 inch fuel lines. The lines will be dried and the pig will be pushed with air along a distance of approx. 5 to 6 km. Please help.
  6. rommar

    Directional Drilling

    Hi i wondering how you would airdrill horizontal and make circulate the hole clean? what is CBM formation? Clay based mud? anyone know about Horizontal Directional Drilling to drill and pullback pipes?
  7. rommar

    Material selection downhole completion

    Tnx Steve for your direction
  8. rommar

    Material selection downhole completion

    I have an environment Low pressure , low temperature reservoir with the following concentration: H2S : >1000 ppm CO2 : >200 ppm Can you please advise on material selection. tnx
  9. rommar

    Radial Drilling

    Thanjs zdas04 but where can i find some some papers are blocked. I'm new in this technology although is a new drilling technique to enhance oil production i'm interessted in applying this in depleted wells. First a basic literature study and prior to built up a propasal case. thanks
  10. rommar

    Radial Drilling

    I'm looking for more information (SPE papers, technology, etc) on Coiled Tubing radial drilling to enhance oil production on land oil field .. please help tnx
  11. rommar

    FMC swivel Joint

    Please help? I'm looking for a FMC SJ HP JA040 OHPO 70T Iman : specs, drawings etc. Thanks
  12. rommar

    3 station or 4 station Koomey unit

    Can anyone tell me what is the dirrence between 3 station and 4 station Koomey unit API 16D built. Our BOP is 3000 psi rated for shallow oil land well. Which one should I need? thanks in advance
  13. rommar

    Rustaway or OSPHO to treat rust

    Thanks BE so I can use both of these products. Our planning is to sandblast all paint and rust , do a MPI test and thisckness test and treated with either ospho or rustaway. Is this correct? What are the standards for marine coating in salt environment ? Please advice.
  14. rommar

    Rustaway or OSPHO to treat rust

    I have a problem with heavy rust parts on a barge and there was wandering which product i may be using to treat rust : rustaway or ospho. Anyone in this field have experience with these product please advice. R
  15. rommar

    Packer for Injection wel

    I have a small project to pump polymer in an oil well to enhance production. What kind of packer would be suitable for this. Its is a open hole well in with gravel pack. We have failed using a squase set packer resulting in communication and a higher casing pressure 400-500 psi in 7" casing...
  16. rommar

    Gold mining

    I'm looking for information about gold mining such as how to start, processes, equipments etc. thanks RM
  17. rommar

    Salt water problem in gas reservoir

    Dear all, There are so many things written in the book mentioned above. My collegae mentioned something with capillairy coil (future) which you can inject remedial inhibitors and decreasing scaling and that is the only potential action at the moment offered by the industry. The book doesnt...
  18. rommar

    Salt water problem in gas reservoir

    Thanks, I will try to look at the literature. I hope this book will give me more practical information and solutions how to deal and handle my problems. I have read something about chemical injections in order to reduce precipitation, but can not realy find what kind of thermodynamic inhibitor...

Part and Inventory Search