We currently have a number of wellheads where we have the choke valve directly onto the wing valve of the tree assembly. Presently the scale/corossion inhibitor is injected downstream of the choke valves. Ops/Process have had a 'brainwave' and decided that in order to protect the choke valves...
Hi,
Looking for some help with printing in Excel. We currently have a database of line conditions (in Excel format)It maybe over 400-500 lines.It is an ideal format for us just now as we are developing the job our process department can add lines to this whenever. However, at the end of the job...
I have written a VBA application for Excel, which involves the user filling in a form.
Is there a simple way to have this form load up automatically when the workbook is opened ?
At the moment Im thinking of using a button with a macro attached to it, but would obviously prefer if the form came...
I am looking at a requirement we have, possibly for a tube in tube coil heater, for a closed lube oil system we have. (To be cooled by water). We looked at sizing a shell & tube using typical design values of U from Perrys Chem Handbook of approx 30-50 BTU/°F ft² h. Which gave us a decent sized...
How would I conditionally format a cell based on the values of two other cells ?
i.e One cell has the following formula =IF(D45>45,1,0)
and another cell has the formula =if (D45<=D32,1,0)
How can I get a cell,say, D46 to go green and have the word "Calculation Correct" based on the...
Gents,
At present we are working on an older plant with very little PID Information. We have two pumps, each with the following duty (Design Rate 387 m^3/Hr Head:90M of water (8.82 bar))
They are connected in parallel, with only one pump running at a time (second as standby). They discharge to...
Hello Gents,
We are replacing a water injection spool directly from HP pump outlet. (Fluid:Water, Flow: 700 M^3/H, Diff Head:737M Outlet size 8")
When we have removed the Existing 1500# Rated spool (LTCS Astm A333-6 SMLS) we have found that the RF Flange that mates to the outlet of the...
Hello,
In Project how do you attach resources to a task ?
Example: One of my tasks involves draughting and checking. If I have the one task (Draughting of component) which will take 15 man-days draughting and 4 days Engineering checking. How do I assign those to it ? If I want to add more than...