I have an application where I want to use a 1/2" folded eye bolt to support a load of 300 lbs with a safety factor of 3x.
Without doing any calculations, intuitively I'm sure a 1/2" folded eye bold can easily hold 300 lbs and has an ultimate breaking point somewhere north of 900 lbs. I plan...
1. I have subtasks that are supposed to last 7 days each and you have to finish one to start the next. I have entered actual start and finish dates on the tasks completed so far. They all took longer than 7 days. Durations are being generated that seem to make no sense in relation to...
Under Task Infomation/General, my tasks all seem to have a Priority of 500. I didn't set it to that.
- What is Priority?
and
- Why do my tasks show 500 when I didn't specify anything?
I looked up "priority" in Help and it didn't return a topic with that in the title.
Hi,
How can I change decimal points in Duration? It is now showing me Duration in days to 2 decimal point accuracy. I would like it to show in days rounded to the nearest day (no decimal points.)
What size and gauge should metal studs be for a residential sheet rock ceiling in a kitchen that is 10' x 12'? What is the proper thickness of sheet rock? =TB
Does anyone know of an on-line resourse that would indicate size and guage for metal studs to be used in a residential cieling?
The application at hand is for two ceilings on the second floor of a two story wood frame residence in two adjoining rooms, 12'L x 12'W and 10'L x 12'W. The...