I'm working on a project that is 3 stories with attic, multifamily residential, type VA construction.
We designed the system to NFPA 13R, with no sprinklers in the attic.
Now the architect wants to add access to the attic for the 3'rd floor tenant.
(note, there's only one tenant on the 3rd...