In 2004 we built a primary metering station on a pole for a newly built RO plant. Recently we retired this setup, to install smaller CTs. The orginal cts (ABB KON-11, 100:5), when opened on the ground, were each shown to have the 2 secondary terminals shorted together, with the factory link...