Hi all,
I just started working with Map 5 (~2002LT). The 'undo'-command seems to be affecting also for the 'zoom'-command, unlike in the previous versions. Is it possible to modify the command (this feature really slows things down).
Yours, Heikki
Hello again,
Agree with you both, because of the shaft the heat production is well controlled when considering one casting section itself. But how about the previous casting section that has already cooled down, any worries that cracks might appear right above the casting joint (after latest...
I'm involved with pylon-design for cable stayed bridge in warm climate, planning to use C50 (fck=50MPa) concrete (C40 in general, C50 in most critical cross sections), cross section is ~3*3,5 meters with 1,5m hole inside. What do you think, is the temperature production a problem, outside temp...
Does anyone know any Japanese (or elsewhere from far east) based formwork-companies? I'm currently involved with cable-stayed bridge which is going to be built in Vietnam. Fancy finding a Japanese company (with internet site) for my Pylon formwork (climbing). I have the sites for 'Doka' and...
Does anyone know any Japanese (or elsewhere from far east) based formwork-companies? I'm currently involved with cable-stayed bridge which is going to be built in Vietnam. Fancy finding a Japanese company (with internet site) for my Pylon formwork (climbing). I have the sites for 'Doka' and...