You guys are both right. However, that does not change the direction of the requirement for a written proceedure. I have been building tanks from ASME SEC. 8 Div. 1 to API5L since God was a boy, I know how and what to do. In fact, I'm almost through with the first draft of the proceedure. My...
I need to write a step by step proceedure for field erection of a 50' diam. API 650 spec. tank. Not a fan of reinventing the wheel, so does anybody have a proceedure I can review and "adapt" to speed the process?