Hydrocad wants me to enter information about the overall percent void of my pond.
what is the recommended percent void for a stormwater pond constructed of earth berms?
Hydrocad talked about stones and gravels, but not earth-berms or compact soils. The pond is a Micropool extended detention...
Thanks psmart.
I think I would model both scenarios and compare.
I am hoping that including the forebay would attenuate the peak discharges even further. I am not sure what the effects are.
The forebay is part of the pond. its a cell within the pond itself and shares same elevation as the pool, just a berm separating the forebay and the pond pool if you will.
Now, according to MD regulation, the forebay is sized to contain 0.1" per impervious acre. Please tell me if I am missing...
I was able to get the 10-yr storm peak discharges below the required discharges by just reducing the size of the low-flow orifice from 9" to 8" and reducing the elevation.
The other issue is incorporating a forebay and an emergency spillway to the hydrocad model. I am kinda new to hydrocad and...
I was able to get the 2 yr & 100 yr storm peak discharges below the pre-developement discharge. But NOT the 10-yr storm discharge.
here are the desired peak discharges:
2-yr = 3.22 cfs
10-yr = 4.45 cfs
100-yr = 15.04 cfs
I have also reposted the project file...
The results are not really consistant with the estimate from the pondsizing report. I am not sure if I understand how to use the pondsizing report following the link. it tells you the ac-ft you need to get the desired peak discharge. Is this the size you have to adjust the pond physically to get...
I am using hydrocad and modeled the devices correctly.
I have tried manipulating the size and elevation of the devices on the riser structure.
I can not increase the size of the pond itself due to physical limitation. The pond is big already. But I am thinking about increasing the height of...
Do you mean increase the height of the riser structure?
or just increasing the size of the pond itself.
The pond does not have a pre-treatment forebay which was not required back then when it was designed. Would adding a forebay (which holds 10% of water quality vol) reduce the peak...
Hi guys,
I am using hydrocad to model my pond and I am trying to reduce the peak discharges for the 2 yr, 10yr, 100 yrs storm to the pre-developement discharg rate.
The pond has a riser structure with 2 orifices at different elevations and a 24inch diam culvert outlet pipe (device 1).
I tried...
hi guys,
I am trying to attenuate the peak flows for the 2, 10, 100 yrs storm to the pre-developement peak discharges.
The pond has a riser structure with 2 orifices at different elevations and also a principle spillway.
I tried modifying the elevations of the orifices but still can't get it...
The existing pond has been sized for the largest storm event. However, I am trying to find out how to control the desired discharges for each event.
As mentioned above, the limiting discharges are the desired discharges for each event.
what I am trying to do is find out what the storage volume...
The hydrocad sizing report was very helpful.
Just to make sure that I understand the sizing table output.
Should I use same table to estimate storage required for all the storm events.
Here are the limiting outfall discharges:
Q-2yr storm = 3.2 cfs
Q-10yr storm =4.45 cfs
Q-100yr storm =15.04...
Thanks guys,
I was able to read-up on some of the documentation and decided to use Hydrocad to model the system and everything worked great.
The output from Hydrocad is alot easier to understand and makes sense.
However, I need to reduce the post construction peak discharge for the 10-year...
I was able to do some calculation following what I read from the discussion with some actual numbers. It really helped to get some input from other people because I am not really confident in what I am doing.
The real problem is this:
I have a parking lot that is been redeveloped with...
The pond is a 24 hrs detention pond with a Riser structure (8-ft) from pond invert. The riser structure has three stages: a 8"x12" weir opening, a 12" orifice, and the principle spillway (top of riser structure).
The riser structure is connected to a 24" diam culvert outlet.
The drainage area...
Hi guys,
I feel really silly asking this question. But, how do you find what the storm event elevation is?
for example, a 2-yr storm runnoff is 2-inch, peak discharge 2.3 cfs. I have a pond with bottom elevation at 100-ft, surface area 200 sf.
what would be the 2-yr storm elevation in this pond?