Yes indeed, "Is the problem in the computer or the printer.." is what I'm hoping someone can shed some light on.
A file I made on this computer months ago printed OK on printer #1 then and prints OK on printer #1 today.
A file I just made on this same computer does not print OK on printer #1...
Thank you for your time.
We have networked computers going to network printers. This problem is isolated to a few computers printing some, but not all files.
I now find I can print a spread sheet on 11 x 17 paper OK but when I print to 8 1/2 x 11 paper the row grid lines print over the rows.
Nope, I've tried every formating option I can find. No change. Large spread sheets need grid lines to be readable.
Maybe this is a file corruption issue.
Thanks IRstuff - but the problem is with the row lines, not column lines. It's as though a 12 pt font is being printed in a 10 pt row. At the top of the page the font fits in the row. Gradually as you go down the page the font prints a little higher unitl, by halfway down the page, the font is...
When I print some, but not all, Excel files the row gridlines get out of sync with the row contents so that halfway down the page the gridlines are running thru the row text. This is using page setup-sheet-gridlines. This does not show up on print preview. It happens regardless of which printer...
To account for arching, the design load on lagging can be approximated by using a triangular distribution: maximum soil pressure at the soldier pile reducing to zero at midspan of the lagging then increasing to maximum at the next soldier pile. Analyse as simple beam.
If your calcs indicate...
The rebar cage can only sink if the material at the bottom of the shaft is somehow losing it's bearing capacity. If the rebar only sinks when the vibro hammer is in use then one would certainly suspect the vibro. What is the pore pressure at depth? How sure are you that the SPT of 40 is uniform...
PEinc, where I work we never rely on tie wire to hold shaft rebar cages together, we always use welded interior bracing designed to provide plenty of clearance for the concrete pump line and the bracing is never removed. CSL tubes are tied to the outer mat. If there is other instrumentation it...
PEinc - what's the problem? The cage should be prefabricated with adequate internal bracing and picked and set into the shaft with cranes of sufficient capacity. Long rebar cages often require a 2 crane pick, more because they're too flimsy to be stood up vertical by a single crane than because...
The factor of safety of weld metal would be 2.0, based on an ultimate shear strength of 0.6 x ultimate tensile strength of weld metal. The factor of safety of the joint may depend on the strength of base metal, depending on how the joint and welds are configured.
Are there experts in this forum who might care to comment on the servicability of the shuttle heat shield design? Since the future of the shuttles will become a subject of public debate, and maybe even a vote in Congress, those of us who are not as well informed should try to get educated.
It...
BobPE, Mark10 sounds like a young engineer who is a little nervous about the ramifications of getting a PE so I was intending to reassure him that it's not as daunting as it might seem as long as you have the skills to do proper work and have confidence in your judgements. While all PE's should...
Mark10, it would be frightening to be on a bridge or in a building during an earthquake if no one was responsible for the design. Like having your gall bladder removed and no one in the operating room feels responsible for the outcome. If you are confident that your engineering skills are good...
jag001, What are "these types" of systems you're refering to? You wouldn't be considering personal fall protection I don't think.
On concrete bridge decks we haven't found anything more cost effective than shooting down a 2 x 4 handrail.
Mike80, prequalify the contractors who are allowed to bid. This may reduce competition and increase prices, but as you note, you may not want the cheapest price you could get with open bidding.