Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Recent content by Jobber10

  1. Jobber10

    Need help verifying/developing an inspection method to provide actual position (GDT)

    The goal is to eliminate the features machined into the OD. In doing so, the entire OD would be considered the flush with the target datum rings, A1 and A2. However, these pipes were supplied by the customer and before I cut them I would like to verify the ID position is in tolerance. Lets say...
  2. Jobber10

    Need help verifying/developing an inspection method to provide actual position (GDT)

    Hello All, Long time lurker here! I have a question regarding how one would inspect the image below. It is a pipe that has a machined OD and ID. The pipe has two target datums "rings" on the OD, A1 and A2, which when centered to one another their axis becomes Datum A. The pipe's ID is machined...

Part and Inventory Search