The goal is to eliminate the features machined into the OD.
In doing so, the entire OD would be considered the flush with the target datum rings, A1 and A2.
However, these pipes were supplied by the customer and before I cut them I would like to verify the ID position is in tolerance.
Lets say...
Hello All,
Long time lurker here!
I have a question regarding how one would inspect the image below.
It is a pipe that has a machined OD and ID.
The pipe has two target datums "rings" on the OD, A1 and A2, which when centered to one another their axis becomes Datum A.
The pipe's ID is machined...