Yes it's true greck ,but as new company we need to build a very wide base of clients .also here in Lebanon u need to take projects to continue, now we have a booming of projects after a while it stops and after a while run again.
so i tried to use MS project to help me more in dividing projects...
Hi,
I’m working in electro-mechanical contracting company.
And we have to much project @ the same time and now we are unable to price new projects because of time.
so anybody have an idea about managing big projects and techniques for pricing more efficiently i feel that sometimes I waste times...
Dear all,
We need a prefabricated treatment plant for treatment of wastewater of school were some student live there. Approximately 300 pers. and water treated will be used for irrigation .
The total flow @ peak hour is 65 m³/day. Plant should be closed or underground.
So if you know a...
Hi,
please find attached link :
http://www.electrical-installation.schneider-electric.com/ei-guide/electrical-installation.htm
you can download a pdf about sizing conductors.
best regards,
chanel
ModonGroup S.a.r.l
DEAR MIKEK10,
THANKS FOR YOUR QUICK REPLY
I KNOW IT'S A WIRING BUT WHEN I CONNECT THE TEMPRETURE SENSOR USING rs232 I VIEW DATA IN HYPERTERMINAL BUT IN THIS SITUATION I CAN BENEFIT FROM THEM I NEED TO SORT THESE DATA SAVE THEM IN TABLE ,OVER 24 HOURS EX:
10:00 10:05
25 DEGRE 30 DEG.
SO...
Dear all
i 've raed thread236-63628 talking about reading data from RS232 serial port.
for me all i need is to be able to read information from temperature devices or pressure sensor etc.. using RS232 and store it and plot information into charts is that a difficult to do?
usually...
Hi all,
we have a project electrical panel for pump station.
in specications they mentioned that:
"Panelboards shall conform B.S. 5486 part 2 and IEC 439-1,form 2a"
does anyone can help me to know the specifications of this panelboards and what they require cos i don't have the standards and...
thank you for you kind help .but i need to prouve to cousultant that we didn't need a surge tank and surge anticipating valve is enough in absance of soft starter.cause in this project he wants autotransformer strating.
Biginch please could you tell me what software to use to make the analysis...
Dear all,
i'm new engineer and need your help to make water hammer analysis i was reading a different document that discribe water hammer and devices to prevent or minimize her effect but i didn't find an easy procedure to do it.
please see attachad file :
it's the shematic of the system...
hi again ,
in selecting pipe size we put into consideration that velocity in pipe should be 0.75 m/s < v <3 m/s
so we try in the formulas above to find the appropriate size where the velocity is arround 1.5 m/s.
best regards,
chanel
hi ,
to calculate velocity u may use this eqation:
V(m/s)=Q/Pix(d^2)/4
Q=flow rate (l/s)
d=diameter or pipe in (m)
u may also see my attached file to calculate head losses and velocity using Darcy-weisbach.
hope that will be usefull .
looking for your forward.
best regards
Chanel...