To learnerydy,
The HP stinger will dictate the end bearing capacity of the driven pile as a unit. The weakest joint is the splice between concrete and steel. This joint will always break first than any portion of pile. Before the tip hits the rock, assuming the pile "runs" during...
I appreciate your input poetix99. Trying to quantify the "effectiveness" of the nozzle "velocity" to reduce the skin friction of the soil is a nightmare. I suppose, "modelling" might help, although the scale factor is so small that accuracy could become a problem...
I am in the process of designing a series of air nozzles for the purpose of reducing the interface soil friction/adhesion between a steel plated object and the adjacent undersea dense sand/silt soil strata, N>50<100 approx. This large object is being "sunked" plumb to about 80 ft...
Concrete piles driven thru quarry rock, riprap size or cobbles may not sustain the impact and therefor would crack, break or refuse before tip elev. is reached. In other words u have installation probs. The moment demand is also greater at this location and ps/pc piles are prone to cracking...
How do you figure the rate of sinking for a huge caisson having W wt. 80ft down into dense sand/silt formation 100 ft below sea level while excavating inside? Since location and plumbness are necessary, what mechanical method/means would I employ to achieve the desired goal? Thanks for input.
A good well designed mix to reach the required strength for the next construction loading phase will do the trick especially if you accelerate the curing.
Scenario is to run say min. 5000 CFM aircompressors blowing several underwater (100 ft sea) jet nozzles on and off cycle at 300 psi operating. Would steam be cheaper instead? How about freeze up and enviro concern at sea? What nozzle valve design would work to prevent soil plug ups? Please help.
I am searching info on how to quantify the performance of a compressed air nozzle under 100 ft. of sea water, the purpose of which is to reduce soil friction/adhesion interaction between a huge steel object being sunked 80 ft. into dense sand/silt glacial formation. Input is 300 psi (air or...
I normaly run the weap analysis and determine the drivability stresses/depth using various hammers. An open ended 10"d pile would plug between 15d to 30d and u may need to clean out pile. I would weld a driving plate at tip and reinforce top if driving stress are larger than 80% yield. Then...
A cast in place pile is where u drive a can then fill it up with rebar and concrete. A driven pile is a driven steel can, HP, wood or concrete pile already casted or made. Dont even think of auger piles because of enviro probs. Depending on the demand loads, the least number of pile to install...
It happens everyday around here. There is now a provision in the contract for the contractor to get paid LF of pile installed. It is now a common practice to perform test piles, weaps, pda's prior to production pile installation. The soils engineer still bears responsibility in some instances...