The end dam is the end of the approach slab. The cut will be approximately 6-8" deep and 9" long across the entire roadway. The "drop-off" doesn't concern me IF it can be done in one active period. IF it can't, that is the problem. I don't have room to install a barrier to protect the...
I'm working on a roadway mill/resurface project that has a bridge within the project limits. The client is requesting that we replace the bridge end dams due to settlement.
The problem is that the bridge has two twelve foot lanes with two (2) foot outside shoulders. The traffic on the roadway...