Howdy All,
I have a bit of a value engineering problem, and would like to see what your thoughts are on my solution.
I'm dealing with a pipeline which is carrying high TDS seawater (lots of salt), at a pressure of around 75 barg. I have to take a sample from that line, so there's a branch...