Dear member,
I am working with project wherein square diffuser is supplied by other vendor/manufacture and plenum box above diffuser is supplied by duct manufacture. Plenum box is suppled though the thermally flexible duct which served by CAV/VAV.
Diffuser schedule
Neck size flow
150 x 150...
water cooled Screw Chiller of 2nos x 125 TR + 1standby proposed @ chilled water supply/return 44 / 55 deg-F. Heat rejection of cooling tower 312.5 TR considering 25% for compression. Wet bulb temperature for site is 81.5 deg.F . my question is utility condition at battery limit will eliminate...
Dear member,
I am working with Petro -chemical plant wherein central colling tower is available for entire plant (process and non -process building). We are purposing water cooled screw chiller based on total thermal load of building for comfort air conditioning for non- process building (i.e...
This Post is regarding selection of control damper .
Duct pressure classification given as 2 inch w.g..
Usually control damper rated for the maximum pressure and maximum velocity, beyond which damper may not performed the indented purpose and hence the operating condition shall not exceed...
ASHRAE standard 170 specify operation theater temperature should be 68F and RH (30 -60%). however, in may case, indoor design condition is 68F DBT and 50+/- 5% RH. I am using E20 form to calculate thermal load for the operation treater. To selected the apparatus dew point I could not find the...
why design profile temperature for month of july and august are same for MINOT IAP in HAP 5.11https://files.engineering.com/getfile.aspx?folder=b895a188-1765-4aad-8518-0a998efd6baa&file=SSN2587.tmp.pdf
Dear member,
I am designing process equipment enclosure for the following design condition
Annual cooling (DB/MCWB) – 91 F / 69.2 F and inside to be maintained at 1040F
Annual heating (DB) – (-17.7 F) and inside to be maintained at 50F
Evaporative colling (WB/MCDB) 73.5 F / 84.4 F and inside to...
I am new to HVAC industry and assigned task to design air conditioning system for 33 KV substation wherein switch gear room has to be maintained positive pressure of 30Pa. Equipment heat gain is of 250kw and room to be maintained less than equal to 25C deg and RH of 75% max.my question is how...
Dear member,
It is general practice to provide 3 mtrs Acoustic insulation in supply and return duct from AHU. Irrespective of AHU capacity. i.e CFM. However, low capacity AHU/FCU/Split Ducted unit may not required upto 3mtrs acoustic insulation. Hence, on what basis acoustic insulation shall be...