mferg318
Structural
- Oct 26, 2017
- 22
I've got a new structure at a heavy industrial site sitting on a pile supported mat foundation. We discovered that there is an existing foundation within our footprint that was used for the removal of a large piece of equipment. We assume this is a pile cap with piles but can't find any documentation or drawings to confirm. My recommended first step is to demo the cap and try to identify how many piles and their diameter. Depending on what we find, I think my approach will be to abandon the pile(s) in place and design my new foundation around it. I would have the existing pile(s) cut down far enough so that they will not bear any load from the new structure. My question is this: what effect, if any, will the abandoned (unloaded) pile(s) have on the behavior of the new pile group? My gut tells me that because they will be unloaded they wont have much impact, but I'm also worried about putting any new piles too close to them. The soils report gives a minimum c/c pile spacing of 3D, but should this also apply to the abandoned pile(s)? I'm obviously going to reach out to the geotech, but wanted to get some opinions on here as well.