INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Basement Wall Loads?

Basement Wall Loads?

Basement Wall Loads?

(OP)
Hello:
Our one car garage doesn't have floor drains.  The garage is attached to the house with foundation walls on all 4 sides of the garage 8 ft. deep with a full basement under the house area.  The garage is level with the upstairs, and backfilled with dirt/gravel.  I want to install 2 seperate trech drains 14 ft. apart (2 low spots in the floor). and pipe the drains thru the foundation wall to the sewer system.  The garage floor is poured on top of the foundation walls 6" thick.  Would it disturb the structural integrity if I cut the floor 14 ft. x 1 ft. for the drains and connecting pipes? The garage is a 26 ft. x 14 ft. This would be 2.5 ft.  away from the wall parallel to the 26 ft. length.  I think the concrete has 6 in. x 6 in. welded wire.

RE: Basement Wall Loads?

This shouldn't pose a problem, but you should discuss it with a good local contractor.  Anytime you 'mess' with an existing condition you can develop cracking, etc.  A 6" slab seems thick for our area (generally 4").  You might want to confirm that the slab is just a slab on grade.

If I understand the problem, you have a 14'x26' slab and you want to install 2 trench drains 1'wide by 14' long.  I assume that the length of the trench drain if full width of the 14' dimension.  The one trench drain will be located within 2'6 of the one wall and the trench drains are perpendicular to the 26' wall separated the basement from the garage. The other 3 walls are backfilled on each side.

The slab should be chipped away carefully so that the WWM is not damaged.  The trench drains should be about 3' wide at the top and 2' wide at the bottom with the underside of the sides sloping at 45 deg. approx.  This should be reinforced with light rebar and the WWM lapped with it to provide some continuity.

The length of the trench drain should be shortened to 12' to allow concrete and reinforcing to be placed at each end.

If you can relocate the one trench drain to increase the 2'6 distance to something like 4' to move it further from the outside wall.

RE: Basement Wall Loads?

(OP)
Thanks dik for your help.

The floor has 2 low spots 14 ft. apart.  That is why I need to have the drain at 2 locations.  The 14 ft is along the 26 ft. wall.  See example below.  I did check and the slab is poured on top of the foundation wall agenst the 1st floor joist, and is 6" thick.  The slab is poured on backfill dirt and 3 to 6 in. of large gravel.  Cannot verify the compaction of the backfill!!  I was going to cut the concrete and install a pvc trench drain and pour concrete back around it.  I didn't know if this would be ok to cut the concrete?


 ***************************
 *                         
 *       14 FT. CUT AREA   
 *         *************   
 *                                 *       
 ***************************

RE: Basement Wall Loads?

On my opinion if as I understand you have a slab "on the ground" (i.e., supported in the wohole surface) 6 inch thick and reinforced with a mesh you cam machine such cut, then do the work itself without much problem; you may want to keep the mesh even disturbed to join later your new concrete.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close