INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

On-site pipe handling damage

On-site pipe handling damage

On-site pipe handling damage

(OP)
We have bought our piping to ASTM and are installing, on a remote desert, site (which is where I am now) to B31.3.

The planning is not too great and there is much pipe handling going.

There was spool pre-fabrication off site in-country and there are numerous welding habitats dotted about the site.

Consequently we are getting some handling damage in the form of flats spots, particularly on the larger diameters and (relatively) thin wall. Most are relatively benign and are not to sharp or stress raising.

We are looking for information on acceptance criteria. B31.3 and ASTM appear silent on the subject.
We have criteria for the pipelines but that is probably based on the requirements for pigging.

We just need to establish a practical agreed criteria.

Can anyone help?
Regards,
Quadswift

RE: On-site pipe handling damage

quadswift,

Kindly note the following:

1.  ASME B31.3

    1.1  302.4.1 Where required the wall thickness shall be
         increased to prevent overstress.....damage...
         backfill, transportation or any other cause.

2.  ASME B31.4

    2.1  434.4 Handling, Stringing, etc care shall be taken
         in handling....pipe, etc to prevent damage.  Pipe
         shall not be allowed to drop..strike objects which
         will dent, flatten, distort, etc the pipe...

         2.1 (b) Pipe shall be inspected before assembly..
                 Distortion, dent, etc and all defects
                 shall be prevented or repaired,,,,

         2.2  Refer to items 1,2,4,7&6 of this clause.

         2.3  436.5.1 Visual
             (a) Material
 
        ( 1 ) All piping ...... shall be inspected to
              insure that no ,,,,,, damage has
              occurred during shipment & handling prior to
              being connected .......
        ( 2 ) All pipe shall be ,,,,, inspected to discover
              any defects as .described in paras. 434.5 and
              434.,,,,,,,,.

         2.4   A434.4
               .......Transportation of line pipe shall
               conform to the requirements of API RP 5LW or
               API RP 5L1, as applicable.  

     
3. ASME B31.8

   Refer to pages 36 & 37.

Cheers,
                   

 

RE: On-site pipe handling damage

(OP)
Thanks PVRV.
There were only half a dozen cases and we have told them that they are unacceptable.
Two were not too bad but it is difficult to come up with a precise criteria. I do not like rejecting things out of hand as it discourages people from bringing things to someone's attention. Usually everything has a tolerance / acceptance criteria.

Perhaps the sub-contractor will take more care with the handling.
Our engineering people say it is new and should be as such when the piping is installed.
Regards,
quadswift

RE: On-site pipe handling damage

There is an acceptable limit and criteria.

B31.4
434.4
1,2,4,7&6

B31.8
Pages 36 & 37

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper – Data Security and Know-How Protection
Our data is constantly exposed to the danger of being intercepted or stolen as it wends its way over global data networks. Data security measures and measures for protecting intellectual property should not, however, first be implemented when data is exchanged – companies must lay the foundation for these measures within their own organization. Download Now
White Paper – Collaboration in the PLM Context
The influence exerted by the Internet of Things (IoT) means that there is a steadily growing need for collaboration in industry. Partners from new industries and areas of application need to be integrated in cross-company business processes to ensure that the lifecycle of smart, connected products can be managed from end to end. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close