×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Structural Ridge Beam LVL

Structural Ridge Beam LVL

Structural Ridge Beam LVL

(OP)
My Architech speicfied a structural ridge beam for my home addition. He will be using a 24' long x 5 1/4" thick x 14" deep 2.0E LVL. The roof load will be 30live/15dead. The room span is 20' I am concerned that this beam may sag over time as it is a 24' free span. Can someone framiliar with Glu Lams give me there thoughts on this design.
Thank you.

RE: Structural Ridge Beam LVL

GluLams can be selected from a load table. You might want to ask them if there is a benefit to chosing the next larger, you might want to have him double check that all loads were on the high side, and you might ask him if he would specify something else if cost wasn't a consideration.

Loads have a lot to do with climate.  There are wind and snow loads. Where are you located?

Are the supporting columns adequate? If you are having doubt about the beam, what about the supports?

RE: Structural Ridge Beam LVL

A 14 inch beam for a 24 foot span is probably marginal if deflection is a concern. The International Paper catalog for 2.0E LVL engineered beams does show 16 & 18 inch depths available. One of these may be a better choice.
Do keep in mind that any beam (wood, steel, it does not matter) will "sag" - it is working like a giant spring to carry the load. However your roof will be "seeing" the dead load only, most of the time (unless you have a lot of snow). Live load capability will be required typically for times of high wind.
One way to address this subject with your architect is to ask for a total load (not just live load) deflection limit of 1/240; this will probably force him/her to select a deeper beam.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - How ESI is Helping Move New Medical Device Product to Market Quicker & More Cost Effic
Early Supplier Involvement has long been a strategy employed by manufacturers to produce innovative products. Now, it almost seems like a necessity. Because decisions made in the design phase can positively affect product quality and costs, this can help add value to OEM bottom lines. This white paper will discuss many facets of ESI, including why it’s so valuable today, what challenges limit the benefits of ESI, how cost is impacted, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close