Jan 9, 2024 #1 Kingcoe76 Civil/Environmental Joined Jan 9, 2024 Messages 1 Location US Do most DOT's require CRCP rebar to be removed from subgrade to proof roll after a rain event? What would be a metric for determining whether or not the rebar must be removed?
Do most DOT's require CRCP rebar to be removed from subgrade to proof roll after a rain event? What would be a metric for determining whether or not the rebar must be removed?
Jan 9, 2024 #2 TigerGuy Geotechnical Joined Apr 29, 2011 Messages 2,672 Location US How do you proof roll without removing the reinforcing bars? Is there another acceptance criteria that can be used? DCP, maybe? Upvote 0 Downvote
How do you proof roll without removing the reinforcing bars? Is there another acceptance criteria that can be used? DCP, maybe?