INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Partially Cladding Liquid Seal Drum for Flare Gas Recovery System
3

Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

(OP)
Dears,

Is it a sound engineering practice to only clad the water containing part of a liquid seal drum in sour service. Won't this create galvanic corrosion in the interface between the cladded portion and the bare CS portion?

Thank you

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

If you clad far enough that the exposed CS is always dry then you are fine.
But if the interface ever gets wet you are in trouble.
Most people try this to save money, and as a result cut it too close, and end up regretting it.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, consulting work welcomed

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

(OP)
I agree with EdStainless. But what if condensation happen on top shell or head of the vessel and slide back to the clad/CS interface? Or is it assumed that the interface is always dry and no crevice corrosion will happen?

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

No. Yes.

Steve Jones
Corrosion Management Consultant

www.linkedin.com/in/drstevejones

All answers are personal opinions only and are in no way connected with any employer.

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

(OP)
SJones,

Is this a reply to the original post or my reply to EdStainless?

Thank you

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

The original post contains two questions to which I replied.

Steve Jones
Corrosion Management Consultant

www.linkedin.com/in/drstevejones

All answers are personal opinions only and are in no way connected with any employer.

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

(OP)
Thank you Dr. SJones, noted.

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

I think its a bit harsh to say its against good engineering practices to have partially cladded vessels - but the problem with "over optimized" units are that things always change. So what your design considered a "design condition" can be challenged almost the day its brought into operation. And then people might forget some initial assumption and this might cause trouble.

--- Best regards, Morten Andersen

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

@Morten - that’s part of it. The other issues are how precisely is the water (/glycol) level maintained; how corrosive is the gas; what will be the opex of inspecting the unclad portion of the vessel versus the additional cost of full cladding; what is the impact of having the vessel down for a major repair to the damage at the interface, and so on and so forth. Partial cladding invites issues. Partial coating might be considered a step in the right direction, but, again, full coating would be better.

Steve Jones
Corrosion Management Consultant

www.linkedin.com/in/drstevejones

All answers are personal opinions only and are in no way connected with any employer.

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

I see this in high alloy vessels a lot. The bottom in more corrosive so they use a high alloy and the switch to a lower grade (less expensive) for the upper portion.
The people that were conservative and allowed some extra margins are usually fine, the guys that cut it close are always having failures at the junction.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, consulting work welcomed

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

@Ed - I’m with you. I’ve come across a couple of vessels with nice knife line attack on the carbon steel at the interface.

Steve Jones
Corrosion Management Consultant

www.linkedin.com/in/drstevejones

All answers are personal opinions only and are in no way connected with any employer.

RE: Partially Cladding Liquid Seal Drum for Flare Gas Recovery System

This is also a generic general problem where application of resistant material ends before it should. My example comes from when I worked on power boilers, where long term overheat ruptures occurred because the designers placed transitions from chrome-moly to stainless steel too far downstream in the flow path. Like this example, cost estimates drove the process though in power boilers the true cost is the lost generation while the boiler is repaired. (Please forgive me if I got too much off topic...)

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close