INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Regarding the Modification of well-pad

Regarding the Modification of well-pad

Regarding the Modification of well-pad

(OP)
Hi Everybody,

We have a existing Well-pad resting on the soil, and there is a pipe at the center of the Well-head. The drilling ring will drill through the pipe (see the picture given below).

We need to modify the existing depth of the well-pad for some technical reasons, and the following solutions are proposed.
Option 1: Fill the well-pad with gravel and a layer of concrete mat. The environment where the rig pad exists has 6 months extreme summer and 6 months extreme winter (around -50 degrees). If water gets locked in the gravel during construction and when the temperature freezes, whether the expansion of ice will lead cracking of the well pad wall of new concrete slab. Please see the picture below for more clear information.

Option 2: Fill the well-pad with gravel and sand, with a layer of concrete mat. The environment where the rig pad exists has 6 months extreme summer and 6 months extreme winter (around -50 degrees). If water gets locked in the gravel during construction and when the temperature freezes, whether the expansion of ice will lead cracking of the well pad wall of new concrete slab. Please see the picture below for more clear information.

Option 3: Fill the well-pad with concrete to the required depth. This adds more weight and money to the construction cost. However, IS there any problem to opt this potion. Also consider the freezing temperature after construction. Please see the picture below for more clear information.

Option 4: Fill the well-pad with Blinding concrete to the required depth. People will be accessing over the modified concrete and the blinding concrete may wear due to accessing the people and the machine or pipe placement. Please let me know your views. Please find the picture below.


Please let me know the best option or any other new option with the pros and cons of each option discussed above. Your suggestions are welcomed!


RE: Regarding the Modification of well-pad

I would fabricate steel platform with removable grating. Similar to whats done on may offshore drill patforms

RE: Regarding the Modification of well-pad

(OP)
Hi, can you share your idea with a pictured example.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close