INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Offshore criteria for Plant air and IA receiver's sizing

Offshore criteria for Plant air and IA receiver's sizing

Offshore criteria for Plant air and IA receiver's sizing

(OP)
Dear All,

I need your feedback regarding any specific offshore criteria available in good design practice which tends to request the designed to consider less buffer time for sizing the utilities vessels (IA, PA and N2 receiver vessels) on offshore Jetty platforms. Would there be any structural limitation in restricting the designed from following the standard onshore 15-20 minutes time typically considered for sizing similar systems.

Thanks

Regards,

RE: Offshore criteria for Plant air and IA receiver's sizing

You state:

A "specific offshore criteria available in good design practice" for air/nitrogen receivers ?

I do not understand your convoluted question and I do not understand why sizing a compressed gas receiver would be any different for an onshore or offshore or on-ship or any other system.

It all comes down to the engineer's judgement about how often he wants to start the compressor. The engineer must consider the volumetric capacity of the both the receiver and the compressed gas piping system. We have no idea about your piping system layout.

Remember the purpose of the receiver: ..... A compressed gas receiver is used to store high-pressure gas from the compressor. Its volume reduces pressure fluctuations arising from changes in load and from compressor switching. A secondary purpose is to provide a central location to collect condensate from the gas.

Many compressed gas systems will run just fine without a receiver....... (However, your compressors will wear out much sooner from constant cycling)

"Would there be any structural limitation in restricting the designed from following the standard onshore 15-20 minutes time typically considered for sizing similar systems"

I don't understand this and I don't know what to say ....

What are you referring to ?... Specifically, which codes and standards govern the design of your systems? ... You have given us no details

Have you ever designed/specified a compressed air system before ?

This might help

https://www.airbestpractices.com/sites/default/fil...

No details = Poor answers

MJCronin
Sr. Process Engineer

RE: Offshore criteria for Plant air and IA receiver's sizing

(OP)
Dear MJCronin, I have designed more than 33 onshore plants having IA and plant air systems, hence you should have no doubts on that.

I am equally questioning whether such systems in offshore Jetty installation would have different design criteria. The reason I am asking is that in fact I expressed there should be no differences in hold-up time and buffer requirements to accommodate IA shutdown and fluctuations in air compressor, however one of the colleagues attending the meeting stated there are unique criteria for offshore installations.
If you have no experience in offshore system designs then you may not reply.

Regards,

RE: Offshore criteria for Plant air and IA receiver's sizing

IMO, the Client may have different requirement for the hold-up and buffer times for the offshore equipment, such as the air receiver volume vs the air header volume, as well as the material of 316LSS, painting, etc. And, your colleague may know the specific criteria from the Client.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close