INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Minimum Pipeline Velocity of Brine?

Minimum Pipeline Velocity of Brine?

Minimum Pipeline Velocity of Brine?

(OP)
Hello,
Is there an industry standard for a minimum pipeline velocity for brine? For sewage, I've heard anything from 2-3 fps. Is there a required minimum pipeline velocity for brine?

RE: Minimum Pipeline Velocity of Brine?

None I'm aware of.

Normally min velocities are to ensure "solid material" still moves.

Brine is all liquid no?

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

RE: Minimum Pipeline Velocity of Brine?

In most brine service erosion/corrosion is a major concern.
If there are solids in the brine then you have a lot of issues to deal with.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, consulting work welcomed

RE: Minimum Pipeline Velocity of Brine?

"Brine" is a rather vague term and can be anywhere from 3.5% to 25% salt to water.

Warm aerated brine eats most metals...

Any more information you can supply?

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

RE: Minimum Pipeline Velocity of Brine?

Water treatment brine is 26% concentration and completely dissolved. One can use the same velocities as that used for water (3-5 ft/sec).

RE: Minimum Pipeline Velocity of Brine?

The cravat to Bimr's comment is 'are you allowing for any corrosion?'
If so then lower velocities are in order so that you don't scour corrosion products off of the surface and accelerate corrosion.
That said if your material does not tolerate 5ft/sec then in truth you have the wrong material.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, consulting work welcomed

RE: Minimum Pipeline Velocity of Brine?

IMHO... I agree with all of the comments above .... Once more we do not know enough about the specifics of the problem

But it also sounds like the OP is confused and does not know if he has a slurry system or not ....

The design of slurry piping systems is COMPLETELY different than other systems

This would be a better question for a process chemical forum .... or perhaps the "Pipelines, piping and Fluid Mechanics" forum

There should be better and more knowledgable eyeballs there

MJCronin
Sr. Process Engineer

RE: Minimum Pipeline Velocity of Brine?

Any piping and valves that are in direct contact with either 10% to 26% salt should preferably be constructed of Schedule 80 CPVC, Schedule 80 CPVC, polypropylene, or piping lined with a non-metallic.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close