×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Domestic Pump and Fire Pump Connected to Combined Water Service

Domestic Pump and Fire Pump Connected to Combined Water Service

Domestic Pump and Fire Pump Connected to Combined Water Service

(OP)
Thanks to whoever reads this and takes the time to answer.

I've got a project with a fire pump and a domestic pump both connected to the same water supply distribution pipe that feeds several buildings on one site. The pumps are in parallel and water will only flow through the fire pump if a fire system demand occurs that the domestic pump can't keep up with, which basically means a fire hydrant has been opened.

The plumbing contractor is refusing to perform the work in the pump house containing these pumps because the fire pump is not specifically rated for domestic water use and therefore the water passing through it becomes non-potable in his opinion. The plumbing contractor has now convinced the GC that we've designed something that is not allowed by code, even though this is a common system and is even referenced in NFPA codes. This particular project is under the International Plumbing Code.

I've never had this angle come up before. Normally, I'm having to answer why a domestic booster can be on a fire system, and not the other way around. Has anyone had any experiences like this or thoughts on what the counter argument should be? Is there even such a thing as an NSF 61 rated fire pump?

If you think that the contractor is right, that's fine to let me know also. But then please tell me how this type of system ever meets code. A duplicate post for this will be added to the IBC codes forum also.

Thank for your help!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close