INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Redundant P/N's for same vendor purchased item, revision to upper level

Redundant P/N's for same vendor purchased item, revision to upper level

Redundant P/N's for same vendor purchased item, revision to upper level

(OP)
Hi all,

We have several product lines over the years of acquisitions that have assemblies utilizing same vendor purchased item. Unfortunately, these product lines use the different part numbers for the same item. Could be as simple as a bolt or spring.

We would like to pick one part number, to supersede/obsolete the others moving forward, which will simplify it for our purchasing group.

However, being an ISO shop, some people think all upper level drawings containing the parts on the BOM must also be revised? What is the norm? In my past, we superseded parts but never revised the upper level. Our ERP system told you what the new/cross refernence part number was.

Curious as to others experience in the matter.

RE: Redundant P/N's for same vendor purchased item, revision to upper level

Since your purchasing group is buying the same vendor part number anyway, why change anything? Part numbers are cheap. Being able to tell what the end item use is more difficult if you reduce it to one number. Your ERP system should be able to do this translation and track the requirement for XYZ vendor part number that is also given any number of other names.

My experience is that half the time someone thinks, like in this case, that consolidation of part numbers is great, then some product change happens so that one product line needs a separate number for a different part anyway.

RE: Redundant P/N's for same vendor purchased item, revision to upper level

I don't know if you -have-to revise things but your impact analysis for making a change without revising the drawings better be very thorough.

Quote (3DDave)

My experience is that half the time someone thinks, like in this case, that consolidation of part numbers is great, then some product change happens so that one product line needs a separate number for a different part anyway.

Some lack of flexibility by having separate P/Ns can cause a huge headache -or- avoid an even bigger one when something like what you suggest happens. thumbsup2

RE: Redundant P/N's for same vendor purchased item, revision to upper level

If the BOM indicates the revision of each part number, or has a p/n change, it would be updated to next rev.
If the assy dwg shows the part, and it gets updated form/fit/function, it would be updated, otherwise no. If the BOM on the dwg has a P/N change, rev would be updated.

ctopher, CSWP
SolidWorks '19
ctophers home
SolidWorks Legion

RE: Redundant P/N's for same vendor purchased item, revision to upper level

alkaspeltzar,

Are you assigning new stock codes to purchased parts?

Replacing a stock code on a BOM is a revision. You can make a note on your change request to the effect that the new stock code specifies the same part, and that there is no change to form, fit and function.

If you are using any form of 3D CAD, you need to update the models to show the correct stock code, so that you can generate correct BOMs. All of these are revisions as far as I am concerned.

--
JHG

RE: Redundant P/N's for same vendor purchased item, revision to upper level

(OP)
Yes, purchasing is buying the same part. But when purchasing is trying to buy in qty, and has 3 different numbers to track, keep 3 locations filled, and tell the vendor "yes, i would like 3000pcs, but ordered under 3 different numbers for invenotry purposes" it creates confusion and indirectly adds cost.

Issue is when you have acquistions of many companies, there must be a way to simplify the builds. Cant tell me that internally John deere or CNH still have separate part numbers internally for a 3/8' bolt

Discussing with out ISO team, we are going to do a mass BOM/Upper Level revsions and ECN which will update the parts, supersede and obsolete the old part all in the ERP system. The prints will remain unchanged. IF the part is pulled up in the ERP system, it will direct the user to the current part, as both are still actually the same thing, just a different name/number

RE: Redundant P/N's for same vendor purchased item, revision to upper level

alkaspeltzar,

Do your assembly drawings call up your BOMs by revision numbers?

--
JHG

RE: Redundant P/N's for same vendor purchased item, revision to upper level

If your plant isn’t building to the print then you don’t have a quality standard to certify with ISO or otherwise. Personally I’d suggest promoting your process engineer into either an unpaid position working from home or fork and spoon operations, then notify legal (and document the notification) of the process quality screwup in case it affects regulated or safety critical products. I’d also start job shopping and make sure my name wasn’t on any release or quality documentation until the process is fixed.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close